| Show FOIl IOK ALTA AI Material for tor Con Caum Mill limited Into limb Camp car loads hectic of ot lumber to bo be used ulel In It time the construction of ot the tho mill at Alto Alln liis arrived ni at Sandy the time material In It being hauled up lip tho the canyon to tho time site Bite for tor forthe forthe the th now new works The Tho ot or tho the lumber will arrive from tram Oregon before beforetime time the close chose ot of tho lImo week aggregating Ii In all about feet teel Manager Tony Tommy Ton Jacobson saul said thIs tills morn Ills that the tue excavations were completed A force of ot tell will be lie nt at work before tho the end o othe of the week and the building will bo be hup hur hurl ned to tu completion na ns rapidly as iossI l btu bio I |