Show LINK IS COMPLETED ON SURFACED ROAD BRIGHAM BRIGHA I CITY CIry Au Aug 29 The Tho The connecting connecting connecting con con- link of or hard surfaced rood road on the th I tate state highway from Plea Pleasant nt Vie View to the southern part put of Boxelder county count I Just north of or the Utah Hot Springs was as completed last w week ek and is now open ollen to the p public Tho Tha work includes a now road around th the the- edge elge of the hill at nt tho tim Hot HOl Springs which overcomes the ne ne- ne necessity of or traffic cros crossing the railroad tracks at two different places and eliminates dim elim mates a R. sharp curve Around the hill hili a n large large- retaining wall wan with a f two Inch pipe fence has been added for or the protection protection protection pro pro- of automobiles automobile Tho The road ws 3 built at t a cost of or with the gOVern government government gov gOV- ern hunt paying on one half haJt of or the tho amount and arid the the- state stale and county count paying pacing one- one fourth each By th the con construction of ot this section auction of or road there Is a n. continuous I stretch of ot state hard surfaced highway between this city and Salt Sl Lake |