Show iD R. R G. G ROADBED MUST BE REBUILT I Twelve Days Required to to I Repair Flood Damage I Approximately twelve days will be required to rebuild the right of way of the Denver fe Rio Grande railroad in the section west of Pueblo Colo Cob according according according ac ac- ac- ac cording to advices received here by B. B V. W. Robbins assistant general freight and and- passenger agent in Salt Lake Trains arc are now operating be between between between be- be tween twe-en Pueblo and Colorado Springs i the first large city north of the Inundated inundated inundated dated district Necessary freight and relief materials together with passengers passengers I gers having urgent business in the district district district dis dis- are ar-a being transported Unofficial reports are to the effect I that the entire roadbed of the Denver Rio Gr Grande nde between Pueblo and Concrete twenty-five twenty miles west has j been washed away The damage which was wrought will wUl require the construction construction construction con con- of a new railroad in this terri ter ter- ter- ter ri tory Detouring of freight originally consigned consigned consigned con con- signed to Denver and points east over th the Denver Rio Grande has commenced commenced com com- corn com by way of or the Union Pacific between Ogden and Denver Local I freight consigned to points west of SaI Salida Salida Sa- Sa lida Colo Cob are being handled over the I j regular route rout of the road |