Show I INSPIRATION BREAKS GROUND fOR ITS lIS MILL At Inspiration ground has already alread be been IJ broken on tile the concentrator site DurInS' DurInS During During Dur Dur- ing InS November about feet teet of or underground underground under under- ground development work worl was pUshed about feet less than during October The long Ions haulage tunnel betteen between be be- tween main mail east and west hoisting shafts and dId Live a Oak property will be feet In length and will be bc begun beun In iii the near neur future Drifting between the Joe Bush h and shafts Is expected to es establish cs- cs h connection about the tue middle of or January Januar Work ork on the tue sulphide Ide tunnel has hus been finished the tunnel now nw being at standardized and antl electric haulage will wl willbe be he installed there thre to remove c all Hit the waste In iii tho tilO mine mille Ml i 11 ore will be bl lifted through h the main ea ett COSt l t slId and West on the tile Inspiration end of the thc property B Because cau e of or the tile dip Ill lp of ot the tile Live Oak ore bed bod body much of It lIc lies at greater depth than the tile Inspiration ore bod body and workIng workings work work- ings Ing Whether hether one on of the tile Inspiration shafts will wilt be he sunk to sufficient depth to tap th the Live Lic Oak ore with a drift or whether an Independent shaft haft will bo ho sunk on the tile Live Oak property ty and ana theore tho the oro ore lifted there to the tile Inspiration haulage level le has not yet cl been decided Beneath the hl highest surface point of or orthe the tile Inspiration between the Joe Bush Dush and Scorpion shafts hant is ja an Inverted peak of or ore oro deeper than the deepest Inspiration tion Uon workings 8 to about a n half haIr million tons bus J |