Show BUTTE SUPERIOR IN fEBRUARY RAISED RAISED- PRO PRODUCTION IJ Although about four tour hundred tons more concentrates were treated In th the th oil all flotation tie flo tation tallon plant of the Butte Superior during during dur dur- ing February than during January a decrease decrease decrease de de- de- de crease of a ton in the value of the concentrates and decrease in the cost of production of 55 65 cents a ton was given for the operations during February In Inthe Inthe inthe the monthly report filed in hi the federal court at Butte yesterday in compliance with an order made mode In November 1913 In the patent controversy over the oil flotation process brought by the Minerals Separation company limited of London against the Butte Superior From tons of ot ore handled In the oil flotation plant In February of concentrates valued at a ton were recovered at a cost coet of a ton In January tons of ore were treated to secure tons of concentrates valued valued val viii- at a n ton ton which were se secured secured le- le se- se cured at a cost of 3 05 a a. a ton During December tons of concentrates concentrates concentrates con con- were recovered from tons of ore milled at a cost of ot 23 a ton to recover concentrates valued at 86 a ton In November tons of concentrates were ere recovered from tons of ore treated at a cost of to recover concentrates concentrates concentrates con con- valued at a ton |