Show ALTA AJA CON CUMI SHOWS ORE ASSAYING l lEAST IN EAST DRIFT Ore assaying IGO a n ton has been en encoUntered cn- cn coUntered in tho the face of or No 0 2 I cast drift In Iii II tho the AU Consolidated In the lie ex extreme ex- ex eastern ca tern workings of or the mine The sample which gave avo this gratifying return was taken across a In ten Inch h streak lying Inc alongside a porphyry dike like which made its Is appearance Wednesday In iii the tho face ace of oC tho drift The ore oro Is a al l heavy a sulphide carrying some chlor chlor- Ild ides The rhe assay certificate gave ounces s Iver 31 per ler cent lead 13 per ler percent cent copper and in lu cents gold sold Saturday this streak had widened out outto outto to fourteen inches No o. o 2 east ast drift Is Isnow Isnow now out 2 5 feet from tho the forty five rort foot rot raise rais above aboe tho the main cast eMt drift which had been en extended about aboul feel cot along tho the Brailie fissure from tho the main working tunnel before tho the raise was vas sent I ill up lunne No 3 I drift which Is being run t cas and ul west from rom the seventy seventy- sc foot Coot raise from froni No 2 drift now measure measures meas incas feet between faces faceR urea ures about one fifty one fC-one The ht west face fae shows about three feet feel of ore orf of or good Jol grade while the east calt face carries between four lour and CI o fl 0 feet reet of oC marketable ore Drifting will continue con con- both ways as to determine tho the ex extent extent ex- ex tent of ot the tho ore shoot when sloping Moping will wi be begin ln A conservative estimate ml made o b by the management gives a n value of or at least e st to the tho ore that has been placed In sight In this part of or the mine since tho the first raise was wat put U up from the lie main maui east cast drift three months month ago aJo When hen sloping h begins this part parl of the he mine wilt wIP contrIbute fully CUny twenty tons of or ore orea a wi day to the output which th the manaem manage manae- management m ment nt announces will wi be maintained l at atthe atthe the rate of or tons a week as soon eoon toon as 8 thy tho roads aro are In condition The Thc Alta Ala Consolidated has contracted with wih the lie n Mines company for tor continuous power for its is power plant and during three the summer r months will wi work shifts on ore oie production and develop develop- elop de ni- ni ment 11 III |