| Show OPEN PINGREE TO TOWNSITE ITE Pingree Filigree the new of Idaho will willbe be formally opened July Juh 2 Tic Oregon on Short L Line ne tracks will be completed com coat June Tune 30 it is stated and the time first train will run run to the new townsite town town- site July 2 2 Special train will run between be be- tween Blackfoot and Pingree on OD time the opening date Excursion rates ha have hare C been ben arranged to the townsite over o the entire Ore Oregon on Short Shore Line system The Time drawings s for time tile town lots will begin at 1 o'clock July 2 |