Show BIG LOS ANGELES TUNNEL COMPLETED LOS ANGELES Feb Feh 2 With With worlds world's records broken for tor rapid and end low cost of or construction the boring of or the great ret mile five Elizabeth tunnel I. the most Important feature of or the tho new municipal water project ct 0 of Los Lo Angeles waa completed at noon Monday l It Jt is second longest water tunnel Inthe in inthe the tho United Stat States p. p It pl pierces rees the forest orest of the Sierra Madre ladre range at a point 67 miles northwest of oC this city and has been drilled through feet of ot solid gra granite a I to Work ork b began gan at both ends of oC the big bib bore on October 5 1907 and went on day and night without Intermission until com corn I This The work was finished a IL year eRr ahead of time and under tho the estimate The total cost of oC the big bore after aCter it is faced with Inch eight-Inch concrete will bo be It has a a. total capacity of ot gallons a a. day All Ml the work on the ISO lAr miles o of f aqueduct aqueduct aque aque- duct is being done by tho the city with day labor under the supervision of William 1 III am head of ot the city water de department do- do nt at a cost which Indications are will run at t least a a. million dollars less than the estimate |