Show VICTORIA TO io TOSI SI TAT ART DURING TUE WEEK Ore shipments from front the Victoria properties in Tintic arc to bo Le started during tho the week Word to this effect camo came front from ono one of tho tim offic officials of tho the com company pan who explained that connections had been made with the new working shaft nut and the tiie oro ore bodies hodies that Hat were left in place several months ago t o when tho management de decided to stop producing anc an and open up its own working shaft Pre Previous o ls to this time tho the ores ore from front Victoria wore were broken down and taken out through h tho the Grand C Central workings s to tho the surface but bitt with extensive extensive ex c development dc it required too I much expense to tr train m these ores ored so great rat a distance The main working orkin shaft of the ictoria Vic ic Victoria ic ictoria toria has luts attained a depth of 1050 fe teet t. t Tho lowest drift is at the tho 1000 foot 1000 foot station station sta tion and connections have hate been hen made nade with tho the oro ore deposits at al this from which point most of the tho oro ore will be hoisted to the surface Ore bins have havo been bet completed near neaT the mouth of the shaft and the ore will bo be hauled by wagon Ia on a A. distance of about 1500 feet feet- to the railroad spur at the Ea Eagle le and Blue BlueBell lio i Bell properties The wagon on road is in in J con condition and weather conditions 1 10 not affect this short haul Some Somo Sometime time Lime in in the summer the company compan contemplates contemplates con con- 1 templates installing a tram from tho the thomine nine mine nine to tho the railroad loading station I J The character of ore from this mine mine mines 1 is s Yer very much like that in its nei neighbor J Central carrying god values in in J silver and lead ea with some gold and c copper Its dividends to date have been in excess of and the therado rado rade of the ore is very much tho the same sarno it this tIns time as s it was durin during the period that hat dividends wore were being paid Recent J show that something like 35 let jet to tho the ton should accrue to the In the drift from tho foot 1000 level r he the ore was Tas encountered much sooner han the management expected The distance e from the shaft to the ore zons zone zon zones is s given as RS eighty feet In addition to the ore in a shorter distance than ban had hid been contemplated d. d some somo reent re- re ent work consid consid- development J gives es a 8 ably raby larger tonnage and the grade rade of tho ho oro is to 0 bo ho oven better han that first encountered Tho man man- is is sanguine that the tho mine mino will all III past performances 1 |