Show OHIO COPPER WILL START TWO T UNITS NITS Of Milt ll IN OCT Colin Cohn Mcintosh general mana manager er of the Ohio Copper returned from his protracted protracted pro pro- stay in the cast east last night When seen at the the- thO company of offices es in this city this morning Mr McIntosh was was tired as asa asa asa a result resul of his strenuous work for the company in the east cast and the long trip during duing the tho hot weather When asked what ho he had done toward financing the company he ho refu refused ed to take any credit to himself for the work that had hac been accomplished He Ho said that arrangements arrange arrange- ments meats had been made whereby the management man nian would have plenty of money on hand to complete the work now planned including the completion of tho the milling plant Mr r. r McIntosh said that they were much annoyed over the non arrival of the steel w work rk for the tho trestle which was the connecting link between the mill milland milland mi and the Mascot tunnel tunnel It I has been decided de do- not to await the arrival of this material but while it is being shipped orders will wi be given for the material needed to complete the second section of the null mill mi and the construction gang will willo wi go o to work on this unit at once an and andave have bave ave it completed in time uni to start both oth sections off of at the same time The chan change e in plans for commissioning he mill mi which has bas been brou brought ht about by the delay in the delivery delvery of material will wi not ca cause se a R cessation of labor in the mine Mr McIntosh said during the interview interview interview in in- that Superintendent McDonald was vas carrying out the campaign of developing developing developing devel devel- the ore reserves with the same sante forces The management has determined determined deter deter- mined to have ore blocked out that will wi insure the constant employment of the themi mill mi for many years vears to c come me On the third fifth fth and seventh levels of the mine they ar are blocking out the ore into ton lots and the raise on the vein will wi be connected with wih these workings s so that the ore can be dropped down from the tho various workings to the cars ears carson carson earson on the tunnel level leyel and hauled direct to the surface in the space of a few few- minutes' minutes time It I may be from sixty to ninety days before the mill mi can be started up re regu regu- u jarly lary This delay is equally disappointing disappoint disappoint- ing to the management and shareholder but it was one of those unforeseen occurrences that has come about in in the regular course of events for which the Ohio Copper company is in no no way to blame The fact that there is ample money on hand band to to keep the company in inactive inactive active operation insures some results being obtained just as soo soon as the material material mate mate- rial is delivered and concentration actually actually actu actu- ally aly inaugurated |