Show WORK STARTED ON CONCRETE STADIUM SEATTLE Wash Jan 3 1 Seattle's SeattIe's 5 Seattle's proposed concrete stadium to be buit on the University of Washington campus campus cam cam- pus Js S to be horseshoe in shape and is isto isto to be built In units each unit costing i about Members of ot the faculty of U the e civil engineering en en- I department of the university I Ihn spent their C Christmas vacation surveying hn n the stadium t site I The Seattle chamber of commerce is i working with the University of WashIngton Washington Washington Wash Wash- ington in obtaining funds for the structure ture Th The stadium will be used not only for university sports but also for tor productions productions pro pro- not connected with the pro pro-j tion A running track is to be bul built t under the concrete grandstands so that students may practice in wintry weather feather i |