Show G POWER c-POWER 1 ST STATION A TION IS PROJECTED TION for tor second feet I water from the Logan river Cache county to generate 50 50 horsepower to furnish for tor power and lighting to has been filed with George agle state engineer by the ther r and Light company compan The proposes proposes to supplement its to a power site on Lo- Lo recites will construct a 3 huge dam and an intaKe the water accord accord- J The diverting be of iron pipe feet i in length with willi the operation wheel i head twenty four feet in diameter The application was filed by Markham Cheever superintendent of the Cache I district and chief engineer of the corn corn- com I pan pany I M. M H. H Aylesworth assistant to the vice president of the Utah Power and I Light company stated that the project project pro pro- really ed the rebuilding of the flume so that more use could be benade nade of it lie He stated that the application cation was in the nature ot of a precautionary precautionary measure and the question of extending the system to supply power pow pow- er to additional districts would be a matter for future consideration |