OCR Text |
Show Vaier District To Purchase 4 (hlorinalors Directors of the metropolitan water district of Salt Lake City meeting Munday at the Alia ulub1 authorized purchaae of chlorine treatment equipment, Hampton C. God be, board executive aecretary, announced. Plans are to purchase a master chlorinator and a standby chlorina-tor chlorina-tor to be placed at the Intake of the Salt Lake aqueduct in Provo canyon and the same equipment for Installation at the terminal reservoir, Waaatch boulevard and 33rd South L Mr. God be ssid the cost will be near $30,000 and that delivery of the equipment will be for early In mi. The board heard reports that preparation ia being mads for utilisation of aqueduct water in 1951. The aqueduct is nearly completed com-pleted and is expected to be ready for testing in 30 days. Mr. Godbe said the tie-la to the city system, barring an emergency, emer-gency, will await the terminal reservoir res-ervoir construction. He said the reservoir will cost In excess of J 1.000,000. He added that bids for I construction, which were to hsve opened Tuesday In Provo, now will not be opened until Friday at 1 10 a.m. I |