Show f MON MONDAY Y EVENI AlTA T. T T. T SHIPMENT OF OF ORE IS RESUMED The road to the Alta Tunnel was reopened last week for the Ala first time since the blizzard bliz blix- lat The teamsters in the the month zard early discharged their first cargo of ot ore at the came In lit the main canyon and came stock pile pie with the tho at Murray smelter the through h to second loading This his completed the lot from the mine The rhe main slope Is la reported to be states exceedingly well The rhe superintendent tate wel over the telephone that ho ran ca talce out will net week part of which wil tons tona of ot ore go to the ore smelter and the rest to the stock stockpile stockpile pile In the canyon pie been on has embargo While the hauling some Interesting exploratory work worle has las been In progress A J alee In the top of the stop with has demonstrated that the ore goes goe up the hal porphyry Other beds overlying the drift on expected In In Inthe the tram first are coming in It is ore is I the level some management that the next hoped by the will willbe willbe level to the StOPS slope raise from the tram wi be in ore all al tho the way |