Show I NEW HOSPITAL UNIT IS ONE Of fiNEST S IN AMERICA A Addition to L. L D. D S. S Institution Institution tion Has Many Intricate Details Details Details De De- De- De tails of Construction According to to contractors who h v worked In many largo large b buildings tho the six six- sto story ad addition to the L L. D. D S. S hospital corner comer of ot Eighth avenue and I D street treet is the biggest little job in a building way In the tia Int mountain intermountain states This Is IB 1 because e tta Interior Is so Intricate In making maldag tb the tha building a ft strictly modern modem up UI to the moment hospital Independent of the remainder of ot the Institution In Intricate Intricate In- In work became necessary Barr sary which would confuse the layman upon a s aC trip through th the building It is Ia constructed to be bo the equal size considered ere of any say hospital In tho the world pay say the hospital authorities Pope Burton the tho architects and W. W V J J. J Tudd Tuddenham d denham nham general contractor The completed com corn plated 4 building will win cost approximately It wUI will bo be ready for occupancy on or lor before February 1 1 If the pr present sent rate of progress is m maintained The building la Is in general g style on the e ex exterior ex- ex tenor an exact match for the other buildings b of ot the institution having walls of 01 pressed buff brick with a rr red 1 sandstone sandstone sand sand- stone blocking forming a high base It Itis is the highest building building- of the tho group non none of the others being more than five live stories The Tho o addition has hns besides six floors loor two roof wards which will m be he used for tal I Isolation purposes The building contains contains con con- sickrooms which are located on ott the lI second cond third fourth fourth and fifth flUh floors On the first floor will be a a. tile kitchen the tho floors floor walls and ceiling being finished In tiles In this this' kitchen food tood will be prepared for tor the entire In In- In Another kitchen located on the first floor floor will be used for the trainIng training train train- Ing Ins Insor of or orthe the nurses In preparing food for tor patients A AL ALso too o on this floor noor are two private dining rOoms for use of at the of officials officials ot- ot of the institution refrigerator vaults for the tho storage of foods roods large vegetable dens den tile the refrigeration plant baths for tor the employees their dining room and the baker bakery On tho the sixth f floor are arc the operating rooms room physicians physicians' and sU surgeons surgeons' rooms chambers where instruments and ond surgical BUrgi ca cal supplies will b be kept a 1 sterilizing plant a 11 nurses nurses' waiting room and the thenn nn anxious lous room for the comfort of ot those thole who have friends or r relatives in the operating rooms moms The operating rooms will Will- have marble walls and enameled ceilings The floors throughout the building are of ornamental tile HIe The woodwork Is birch with mahogany finish All An of ot the plum plumbing ln baths and the lavato lavatory equIpment equipment equip equIp- ment will be of solid porcelain a u. a. a feature which makes tho the plumbing reach the high figure ot of I Each ach of ot the tho floors will willbe willbe be e equipped with a aas gas as Incinerator for forthe forthe the burning of all refuse that comes comos from the Also AIlo on on each floor a n. n sterilizing apparatus will wilt be bo installed wherein pan pans Instruments and other articles ar ar- ar- ar tides will be hygIenically hygienic cleansed The heatIng s system which is known knon as 08 the tho Webster modulating 5 system will m be In operation within two weeks The Tho tile We work worle according to the con con- contractors tractors is the mo most t intricate and ex extensive ex- ex of at an any in the state This la Is owing to the fact that man many of or the walls are arc of tile being thus constructed to Insure insure In- In sure ure perfect sanitation Plasterers are areat no at work woric on the sixth floor toor tile Ule setters sot set te throughout the building carpenters In man many paris of the thc building an and plumbers and cement and andIron andIron andiron iron workers on various arlous floors Tim windows are placed and the cement walks walks' about the build building In are arc nearl nearly all nU laid and set I ot So much work vork IB is required to be completed com corn 1 in that It is la not probable probable able that the building will be bEl finished until th the en end of January Jan The hospital authorities ho however r. r arc are continually C I at the contractors contractor as M the tho addition t is greatly needed Many patients patient are aro d dally daily lIy turned away as u the old part of ot the in institution In- In Is ta kept oon constantly full Ph Pity Phy- I who have hae been trough rough the addition addition adI ad- ad ad ad- art Pay fay it is I. the unit of t Its sl sIze in m th Lb country |