| Show Development Shows Great I Ire re Deposits to Be Ba Richer at Depth I Lambourne Gives Outline of Accomplish Accomplish- New Type of Hoist to Be Turned Over Ore Reserves Extensive and Production Pro Pro- at Big Rate Overhead Cut by byi I i New Improvements Park City Unit Going Strong ent George W. W Lambourne of the Park Parl Utah Consolidated Mm- Mm Ilni i in an interview Saturday gave a comprehensive review in the Park Utah mine of the company The Park Parl in 1926 produced approximately pounds t. t n n excess of oun ounces of silver and about z no nc as wen vell as more than ounces of gold It is the in Utah H H said as the western othe Park Utah mine and proven on the evel for a distance of it was opened Ui foot level which of the mine On oot level the ore was wasa a distance of feet rn face still continues ast of ore of unknown t feet to the west first ore was opened foot 0 level a crosscut re about sixty five feet further crosscutting of roved the width of the five feet The bah bah- drifting has been acon ac- ac on ore of unproven foot 00 level the mans man man- s proven proven the ore for strike and crosscuts at feet proved the ore twenty to twenty five Development work on ont 10 t level is much more morea morean an a on the upper levels s' s is is the water level of I JE S INCREASE gement is ready to beI be- be I operations on the 1650 and nd ore samples taken I ike of the ore there forI for L feet for an averof aver aver- I oft of ten feet representing ore gives not net smelter mine of better beter than 17 r r present market marlet prices pries ad and zinc alues have not dehe dehe de- de he ore bod body has been o 0 and the values n the foot 1800 level are on the foot 1500 level level I le rease in silver siver values been offset by increased d d. d lead and zinc ion of a new t type pe of i t being completed and praton next week weel It I foist of Its it kind to be bep I. I 11 p underground mine in 1 I resident Lambourne is as n a capacity of hour eight shit shift This I Ei g Installed on the 1500 P rk Utah mine s ITSELF OR as a capacity of lift lift- lf- lf l ons ons of ore an hour 1000 peed eed is variable with wih ti at the present depth in the Park Utah Uth of leed is feet a min mm- 0 the speed is 1000 i beet te The hoist is de- de pe ip hoisting and the I pockets and has many being operated much ui modern electric ele- ele I P modern skyscraper It I devices devies as well as at the top tol of iS located in a small smal th top of the shaft I. I t Ontario drain tun- tun main advantages are arees j I es excavating and the les' les it operation due to tol that does away with wih I and hoisting a controlled either by the 01 or moving cage age The he I completed I e turnover will wl take I week i eel This new hoist I W. W problems of the kE J ine for Its is entire life le jine installed at the of the Park Utah tit Uth ter one year of oper- oper en n per cent service servie g aU all of the ore from 0 ty unit and brings aU all alland lE and much of the sup sup- mine Its Is savings are aree e expectations of its is H The entire entre cost of its it will 11 be paid for through by April 1 1 r t e months after it i was l LJ ration ity ton unit uni in 1926 broke I record cord run for both in tonnage 1925 The present ii is tons of ore a ar r e is ample ore in sight Hs is rate of production i ble period ahead The Is running at with three shifts a is tons and the milling grade of oft I t |