Show Cane Creek Well Do Down n 2075 Feet MOAB BOAR June 7 The The Shafer No 1 I well wellon wel on the Cane Creek dome Is down 2005 2095 feet having started to torl drill rl on down don to toa a a deeper horizon after atter falu failure e to get a successful at st 2028 2025 fe feet feel t where the well wel blew In last lat December The No 1 I well wel on the Shafer dome Is I. I down 1100 feet teet and drilling through nard sandstone A party oC ot tr fr from n m the United States State State ge geological survey are here hereto hee to ma make maa a survey of the tile local oil 01 fields field elc ma The Utah Petroleum has commenced curl con of ot a boat and is I constructing a dome ome road to the drilling dr site on the the Gibson 0 |