Show Low hOW Road Bid Tops Estimate Low bid on Improving a short stretch of U V. S. S highway 91 in Davis county was or above engineering esti mates ates the state road commission announced Tuesday RayH Ray H. H Leavitt chairman chatman Bald IId that the bid would be forwarded fOrWard d to the U U. S. S bureau ot of public roads district office at Ogden for ifor approval approval approval ap ap- ap- ap inasmuch as the tow offer was more than 5 a above y the estimate J I Young Smith Construction C Co Salt SaIt Lake City made the lower bid of two submitted for the 39 mile mUe pf highway ay which Is to to include two timber and two concrete concrete concrete con con- crete bridges bridge from the V Weber ber county line tine south tow toward rd Clear Clear- fh field ld The second offer otter was wa r |