Show r Award for Construction on Scofield Dam Goes to Springfield Building Contractor PRICE Contract FRICE-Contract Contract for tor construction i lion Uon work oe on the dam damon damon on Oft Soldier mountain his haa been awarded to W. W W. W Clyde Spring Spring- YUle building contractor it wa was wass revealed by the Denver office of ot I the United States Staten bureau of reclamation mation this week E Engineers rs on Oft the project have ha begun work on the highway survey sur ur vey my 1 and railroad ad lines Unea to the dam site ate The TM branch highway will wID be beabout beabout about 1000 feet Nt lon tong long and the railroad rail raU road roM spur pur approximately feet feel Two To caterpillar tractors now are I clearing space pace for tor both rights ot at I way 1 While hUe all sU legal detail have not noli been worked out on the project 1 these the will ill not Impair actual construction con work Parley Neeley engineer en en- en 1 r in charge Mid said A survey urvey survey crew has baa been at the scene during the week and aDd contractors tractors will a arrive arrive ar ar- rive in the very near future Employee of ot the reclamation bureau bureau bu reau other than Mr Ir Neeley who I have hare arrived here to work on the dam include Banard L L. Menden I and abd Thomas S. S Farr assistant en- en Dalton 1 L. Hutchcraft clerk and S. S Howard engineering draftsman Betty L. L Liddell junior steno stenographer pher has hu been employed from Price Additional Addi Addi- government workers are e. e ex expected expected ex- ex to arrive soon lOOn Main aln offices of ot- I I for the bureau have beene been established e on the second floor of the Liberty building I An election of ot stockholders of two water districts will wm take place October 8 authorizing nl the legality of ot a contract on the project Approximately one year Is expected expected ex to be required to complete the project which will ill coat cost around |