Show NEW HIGHWAY LINK WORK WILL START HAILEY Idaho Idaho Idaho Construction of ofa a aa a. a saven seven mile mlle link of ot the Central Idaho highway will begin Monday employing 45 men men reports Dan J. J Cavanagh Twin Falls c contractor who was awarded the contract tor for Registration of workers is b being made at the Halley HaUey relief office and at Gannett Carey and Picabo since provisions of ot the contract require the use of ot local labor The new road from Gannett to Picabo will wUl be graded and surfaced to a full width of ot 30 feet with a crushed gravel covering six inches thick It stretches adjacent to Silver SUver Silver Sil SU- ver creek where land Is swampy The roadbed will wUl be raised as much muchas as three feet requiring the hauling In of ot square yards of gravel Mr tr Cavanagh said ald Sixty thousand yards of excavation excavation excava excava- tion from borrow pits will be bo used in making the road base bue The rhe engineers engineer's engineers engineer's engineers engineer's en en- estimate of the Job was Work will be completed next summer |