Show TUNNEL WORK MOVING AHEAD Work on the tho Ephraim tunnel which will bring new now irrigation water water water wa wa- ter into the Sanpete valley la le proceeding pro pro- I at a rate of at more than feet per week B. B O. O Larson engineer engineer engi neer in charge of the Salt Lake City office U. U S. S reclamation bureau re reported re ported here hors Tuesday en on his hi return from an inspection tour The tunnel which will be feet long when completed has hu been bored feet into the mountain from the west portal and OO feet from the east portal five Fifty men areat are areat areat at work on the project which will cost nearly and bring floodwaters flood floodwaters floodwaters waters from Cottonwood creek onto the farmlands near Ephraim Mr Larson said that despite the month four shutdown last winter tho the contractors Morrison Knudsen company of Boise Idaho should easily easily eu- eu ily finish before the contract time Um is b up May 25 |