Show Heber Heher Installs New Fire Plug Plugs HEBER CITY Mar 16 Aj AI As completion of the new Heber waterworks system the city 3 are at-a now Installing eight i nr he six Inch fire hydrants hydrants' In the U to business district The he inch four-inch hydrants now vj no use will be moved to the district When all the thc fire hydrants installed any part of the city be je reached by a block and a h len length th of ho hose hoe e which will be be added protection against fire fires ards arcis y The inch four hydrants ar are arc placing all two Inch hydrants rits u In the thc future there will be noth smaIl smaller r than Inch four hydrants li stalled The project Is 15 being finan through funds from the city wa works project When the work completed the officials have b be assured by the nati national nal fire und writers that the fire rates should be he reduced from 12 to 15 per cent |