Show UTAH MOVES TO CONVERT STREET INTO BOULEVARD Steps to make State street a boulevard boule boule- vard yard between Seventeenth South street and Murray were taken by the state road commission Friday when it opened bids for concrete paving ofa of ofa ofa a center strip to cost The paving will replace street car tracks which have been removed Work will start In the spring Tho The commission aL also alco opened tenders tenders ten ten- ders on graveling of 9 2 1 miles of road between Levan and Gunnison to cost On January 17 it will open bids for graveling 36 miles of road between the sugar factory and d cost |