Pages | 15 of 28

Salt Lake Telegram | 1929-08-23 | Page 15 | U. P. Stage Line Will Open Sept. 1

Type issue
Date 1929-08-23
Paper Salt Lake Telegram
Language eng
City Salt Lake City
County Salt Lake
Rights No Copyright - United States (NoC-US)
Publisher Digitized by J. Willard Marriott Library, University of Utah
ARK ark:/87278/s61g1v7h
Reference URL https://newspapers.lib.utah.edu/ark:/87278/s61g1v7h

Page Metadata

Article Title U. P. Stage Line Will Open Sept. 1
Type article
Date 1929-08-23
Paper Salt Lake Telegram
Language eng
City Salt Lake City
County Salt Lake
Page 15
OCR Text U U. I P P. St Stage ge Line Lipe Will pe Sept 1 The the P Stages a 8 sub sub- b- b y of of he Union pa Pacific system tern tem will vIll start bu bus service between Salt Lake ke arid Por Portland l September l li lit t 1 I op operating operating- t two to vo round trips trips' daily dally J. J assistant to tho the pi president Ident I- I S dent of oC the tle system announced here Erlda He was met in iris hit Salt Silt Lake ke by y J J. P. P OBrien O'Brien e manager of oC the thc O WR R. R N. N
Reference URL https://newspapers.lib.utah.edu/ark:/87278/s61g1v7h/16100933