Show Seward Seattle-Seward Cable I Laid by Signal Corps SEWARD Alaska Nov 14 1 By A A. P. P P.-A P. A cable of ot the army signal corps renewal of oC which was completed completed completed com com- hero recently by the transport transport trans trans- r port Dellwood linking Seattle and Seward Is miles long and weighs tons Tho The cost of ot renewing the cable which was established In 1904 with witha a no line from Seattle to Sitka Alaska I was put at Colonel George Gibb In charge of ot relaying the ca Ca- Ca ca 1 ble reported that the deepest place found fouad was 2413 fathoms southeast of Middleton Island seventy-five seventy I miles south of the northern northernmost I point of the Gulf Gult of ot Alaska The floor ot or the gulf gul he be added was as smooth as the plains in the States The line was lad laid at an average depth of oC 1718 fathoms The Tho relayIng relaying relay relay- Ing v. v was s begun In January January- |