Show ON ON WATER TENSION OPENED mission Refers Bids to toly ly Engineer for Tabulation far the construction of or water ater ett extension sion No Xo were viere open opened d iy commission toda today and reto re- re to tOt the e city engineer for tabu- tabu The p P. j J. Moran Paving comI com- com I the the Campbell Building Building- com com- 1 1 f ere the bidders system will be a a. main pressure run down from the tho high line Ii Olt It Into the city's distributing way of or Sunn sido avenue construction of ot the conduit has een contracted for and will gh line jine from the mouth of or Par- Par anon anyon to a point below the canyon connect connect- Parleys Parley e Parleys Parley's s canyon rd d will be across s nYon to Big Dig Cottonwood ling ing water to tho the east eRst bench |