Show Free State P More fore Shannon Power Pouter DUBLIN March 23 AP Tiie success of the free tree state River Shannon electricity scheme has led ledI I the government go to decide on com cons pitting the tho second section of or th scheme Tire The system is now In operation throughout hout the country and the tho de demand do- do J mand inand for tor current hiss has been boen gr greater than experts ex expected T The Tho o smallest small est cst c cottages arc are installing electric light s systems system The original scheme was divided cH Into two t parts part engineers t a a. conservative view of ot its It U is 19 now evident that th the partial plan In Is not sufficient to sup ply all the tho customer Within the next two years the tho complete project ct will be developed The Th total cost will exceed |