OCR Text |
Show ADVERTISEMENT FOR BIDS Notice is herein given that the Board of Education, Nebo School District, Spanish Fork, Utah, will receive bids fcr all the labor and materials required in connection with , the construction of addition and alterations to the Mapleton School, located at Mapleton, Utah. Bids are to be submitted separately separ-ately for the (1) General Work, which includes everything except the plumbing and heating and the electric wiring; (2) Plumbing and Heating; and (3) Electric Wiring. Bids are to be' submitted in accordance ac-cordance with the respective plans, specifications, and other contract documents now on file with the" Board of Education of the Nebo School District at Spanish Fork, Utah, and at the office of Claude Shepherd Ashworth, Architect, Provo, Utah, upon receipt of $15.00 per set for the General Work, $15.-00 $15.-00 per set for the Plumbing and Heating; and $15.00 per set for the Electric Wiring, which deposit will be refunded provinding the bid is submitted in proper form and upon receipt of such copies in good condition within ten (10) days after the bids are opened, otherwise, the contractor will forfeit for-feit his deposit. Each bid shall be made out on a form to be obtained at the office of the Architect, and shall be accompanied ac-companied by a certified or cashier's cash-ier's check or bid bond for five (5) per cent of the amount of the bid, made payable to the order c-f the board of Education, Nebo School District, and shall be sealed and filed with the Clerk of said Board at the office of said Board in Spanish Fork, Utah, on or before be-fore February 11, 1953, at 8:30 p.m. at which time they will be opened and publicly read aloud. The above mentioned check or bond shall be given as a guarantee that the bidder will enter into the contract if awarded to him and will be; declared forfeited if the . successful bidder refuses to enter into said contract after being re- quested to do so by the said Board within a period of fifteen (15) days. The said Board reserves the right to accept or to reject any or all bids or waive any informality informal-ity in a bid. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof. . All work under this contract must be completed on or before August 15, 1953. Dated: January 26, 1953. BOARD OF EDUCATION NEBO SCHOOL DISTRICT B. L. Issac, Clerk Published in the Springville Herald |