Show 0 SACKING ORE ON THE GRANITE CONTACT i iI I Superintendent Fountain of the Granite Contact has phoned from Skidoo that he has commenced sack ing ore from the new strike on the property Tho shaft which was bunk to cut the ledge at its dip has pene trated the vein and in the bottom a foot streak of ore Is exposed that runs 250 to tho ton the values being prin dually In sliver In prospecting on No C claim KOIHO high grade ore has been found Tho shaft on the Contact claim has reached a depth of 50 feet and a crosscut is now being run to exploio tho ledge At tho surface an 18Inch streak shows high silver values and the management Is In hopes of open ing something of Importance In crosscutting cross-cutting the ledge The tunnel on No C I Is In S5 feet and will reach the ledge within 30 I feet Rhyollte Herald |