| Show the old ford bridge work is now being actively prosecuted on the new county bridge which is to span provo biyer at the old ford thirty ave piea have been driven and the oregon pine covering will be laid as soon as the timber arrives which will probably be in a few days it is estimated that the cost of the bridde will be about 1200 approaches have been from either side to the bridge at a cost of about of which was paid by poyo chiy utah county pays for the construction of the bridge the pile driver which is in use is owned by IT tab county its hammer weighs 1580 steam is furnished by the vincent company engine and is conveyed by means of apices to alie pil drivins engine which belongs to the union pacific railway company mr loan williamson the lake view road supervisor has general supervision of alie work and Mr Brusset of salt lake has charge of the pile driving |