Show School District Airs Drainage Project FARMINGTON Tentative plans have been made b by the school board to install a drainage system for the track at Dvis high school nd to construct a garage for the school districts buses Jn In n the spring ot of the year said Elmer J. J Hartvigsen n superintend superintendent ent of Davis county schools when it is needed most a large section of the track is generally under water The drainage system to remedy this situation would be 1200 feet in len consisting of six inch vitrified clay tile and it would cost approximately approximately matel 1689 However continued Mr Hart Hartvigsen Hartvigsen Hartvigsen the plans for the drainage system are still in the stage and no work on the project could be started until various lens lems such a of the drain drainage drainage drainage age have hae been solved Also under consideration by the school board is a proposed school bus garage to house four buses It would contain a grease rack wash rack paint shop and lounge for the then drivers It would be located at the Davis n high school probably north east cast of the main school building |