Show Improve Southern Divisions Engineer Kellehcr has been over the Utah Pacific on a thorough inspection inspec-tion trip to sec what Is needed to improve Im-prove the road and bring It up to the standard Whatever Is needed will be done at once Already a large force has been put on tho section and the bridges will be strengthened while the road Is being otherwise Improved The JuabMllford line Is also to be Improved with now tics and rails where needed and the track ballasted Then when the OphlrLeamlngton cutoff Is built tho lino will be a fine one |