OCR Text |
Show Camp Cronaouts. Tsrlt Clly Record. , It is calculated that tho Alliance company com-pany will complete its contract with the Crescent company early next week, and the lianaucr tunnel be extended to a point underneath the Crescent's big incline shaft together with the stipulated stipu-lated cross cuts from wall to wall. The Crescent will then have a perfect drain and the work of sinking the shaft to the 400 level will be pushed to completion and the output of the mine greatly enhanced. en-hanced. Several members of tho board of directors di-rectors of tho Himalaya jroup of claims, situated at the head of Iron canon, are expected in the Park in a few days and will make a thorough exuminntion of the property with the view of resuming operations at once. As soon as the Hanauer tunnel is completed bo that the air can be used, a force of men will bo put to work in the old Alliance upper works and ore Hoped. The machinery i'.ir tho Anchor has all becti taken to the mine and willsoon he in position, and the building is rapidly rap-idly Hearing completion. The machinery for the Glencoo concentrator con-centrator is now all in place, and embraces em-braces the very bct ruaue for that kind of work. Matters at the Silver King now pro-sent pro-sent a lively appearance and soon its whistle will bo heard in the land. The Anchor anuonnces another assessment as-sessment of 20 cents a share this week, payable on or before August 10th. - |