Show THE GREENE REDUCTION COMPANY col T L local representative of the greene reduction company now engaged in the mm milling re illing of the old geyser marion tailings dump and low grade ore at mercur utah informs the mining review that many improvements have been made in the mill this spring and summer and that the plant is now in condition so that it can be worked upon a more economical basis than was formerly the case the wa ter pipe line two miles in length from the spring to the mill has been repaired and new connections have been put in the engine and other machinery has been taken apart and thoroughly repaired and the solution tanks have been so arranged that an upward as well as a downward percolation has been secured while neyr new filter bottoms have been put in As a matter of fact the mill is now in better condition than ever before and everything is in readiness for active work as soon as the installation of the new hoist and skip is completed which will be before the end of the present month col states that he has a full line of supplies chemicals fuel etc on hand and that work in gold extraction will begin in earnest as soon as the new hoist is in operation I 1 |