Show NEW SHAFT FOR EAST TINTIC much importance it attached to the campaign of work which has been mapped out for the property of the eu eureka reka standard company controlled by E J president and general manager of the tintic gintic standard says the eureka reporter the organization of the big east tintic gintic mine will be used to good advantage in prospecting the eureka standard some time ago a site was selected for a new shaft which according to james W wade is to be of four compartment size in order to carry a large ventilating line which will no doubt be needed if underground condi conditions p eions are similar nilar to 10 those existing in other mines of that locality A water line is now being laid to the site of the new shaft and it will not be long until sinking b operations are under way tile the new nev hoisting engine and m motor ator being in place and properly connected with the main source of electrical supply y at the tintic gintic standard the point where the new shaft is to be sunk is about four hundred feet from the old montana shaft of the eureka standard company the montana shaft was abali abandoned and another point selected for the work for various reasons chief among which are close proximity to the line li of the goshen valley railroad proper yard room and dump room the new hoist for this piece of development work ls is good for about 1500 feet and judging from preparations which are being made mr and associates intend int to carry out a large amount of work in an all effort to open ore in this large tract of mineral land which lies to the S south of 01 and adjoining the tintic gintic standard the property to be de developed carries the same system of fissuring as the standard and has other earmarks ear car marks of a mine |