Show the property consisting of two claims of the golden key mining company has been sold to the knight interests for a stated price of 1500 the ground is in the course of the five mile tunnel which the tintic gintic drain tunnel company is driving under the tintic gintic district of utah work of sinking the no I 1 I 1 shaft of the iron blossom consolidated mining company at silver city utah from the pre present sent depth of 1900 feet to the 2100 foot point has commenced the 1900 is at present the deepest level in the mine the vein has been cut there and owing to the fact that the lime is the company has decided to go deeper in search of the soluble lime the mine is under the 4 of charles E zabriskie |