Show NEVADA HILLS IN MAR MARCH CH the report of march operations of tl nevada hills mining company of nevada shows 1425 tons milled of an aver ave age value of 1796 from which 1521 t ton on was reco recovered vered at a net cost of 15 s leaving a deficit of 0 68 per ton to whir abl el must be added construction costs make the net loss for the month TX ton twenty three and two tenths per cei ced was recovered by concentration and fil by eya a total of per cent pi P ton costs were as follows mining milling martelin mart etin 68 cents property tax 11 cents interest 2 cents examinations and tests 42 cents cent general expense total ope operating operatic ratin g coo co per ton 1589 plus current construction 11 cents total cost per ton 1613 less laneous earnings 12 cents net cost per to 1601 development cost and stop labor and assays essays for milling cost adi ai supplies and power |