Show MONTANA the barnes king mine produced in gold bullion in january from the treatment of tons averaging 1086 per ton the corbin copper company has closed down the blowout property in rochester district but continuous sinking its gam beinus shaft at butte which is now down feet the davis daly at butte continues to ship about tons of ore daily about 15 feet east of the large hesperus a new ore shoot of eight per cent ore has been cut in two places the rainbow development company has been caused much annoyance through the failure of the electrical equipment for tha J butte london to arrive the company now has no definite expectations as to the time of its arrival j the tuolumne mining company of butte made net profits in january for the first time in some months there were shipped tons of ore containing close to five per cent copper this ore is being mined on the 1800 and 2200 about the end of the month the crosscut on the 2400 is expected to reach the ore shaft sinking will be re fumed in march 1 the concentrator of the east butte at butte which is being enlarged from to or tons daily capacity will soon be aready eady for operations work on the 1500 oot foot level is proceeding slowly A good body of ore was rece recently discovered on the leyel evel 0 of f the old east butte property in the dutton shaft two cars shipped assayed 7 mid ild 67 per cent copper |