Show BOISE VALLEY FIVE J MILES FROM NAMPA Less than five miles of track are re required rea required to tu be laid to complete the Boise Valley Electric road to Nampa says I the Boise Boi Statesman With the ties on hand and most of the steel rails ralls it was I 1 4 found that would be required to i complete compete the road and pay p y for the ad additional i equipment that would be required re required i At a meeting of the directors i ithe the sum required was WM raised by b sub subscription for treasury treasure stock and thee the cash Cl h was Willi turned into the treasury treasure It Itla ItIs Is la now announced that construction construction 1 work will be bt commenced at once i |