Show I TO TU ROAD I Contractors Preparing Bids for Im un Improving Improving proving Denver Rio Grande in Southern Utah I Special ESpecial to The Herald Price June 2 Several Utah railroad contracting firms and R 1 Individuals had bad rep representatives at Colton last Tuesday going over the ground between Nolan Nohh Noil 1 and Cel CeI Celton ton During th the t next week they thc will sub submit submit submit mit bids to the Denver P tio to 10 Grande Granite for double tracking the road from Colton to to Nolan a distance of seven miles There are two tunnels to widen iden and while this work wod is being done shoo sho tIles files are to be milt built around th the tunnels that traffic not be Contracts for the work It is understood are areto to be let dur during durIn durIng ing In the coming ten days dRY With Ith the completion of this piece of grading the Denver Rio Grande will have bave miles mile ol or double track from Tucker to Nolan It is believed the double track work will extend on as far faras faras faras as Mounds this present year The engineering department still sUII has a corps of surveyors in the fluid field working to the east on the line from the vicinity of Hill flU Top on the Sanpete Valley Valle branch to Soldier Summit The opening of or the miles at Miller Creek and at Panther canyon two new flew propositions will give the road an additional tonnage from this immediate vicinity by September of 2000 tons dally daily |