Show WILL PAVE INTERSECTION To Close Gap in Sixth East Pavement at First South The work of ot laying the asphalt inter intersection intersection Intersection section at First South and Sixth East Ea t streets will be completed d some time this week the concrete having been laid yes Sixth East street was last fall but the intersection at this point was not put in as It was the tile intention tion to pave First South with asphalt this year This did not materialize and the th board of public works decided to put in inthe the asphalt intersection before winter inter in order to make the thoroughfare th complete from Brigham to Third South street First Firs South will be b paved in the spring |