Show ON TH GRAND GENTRAL President Holbrook Talks on icy of the president of the Grand Central company was up from Provo yesterday morning on mining busi Hess lie Stated that tile shaft at the Grand Central had just about reached tile level and that an average of four feet a day wa being made While we are taking out some ore and doing some In the said he eibo is being to getting the shaft to the mark the farthest we can go gon n the present cable which Is 1500 cot bug At the mark room enough will be inie to start drifting at that but sinking will be up Yes the front the level is looking fine and the sames true of con conditions on the but at point iS nOt allowed to ro with sinking lie also stated nothing was being done toward the Victoria through Grand at the present time nothing bad beez done in dl for a month and nothIng would be until in the shaft been discontinued The prospects for ore orein in the Victoria he said were good and he had reason to that a mire would result front plan of development mapped out |