Show WORK MARYS I Contracts Being Awarded to Local Contracts are being let this week to local men for the construction work still to be done on St Marys cathedral Nothing will be given out at this time by those who have the matter iii hand but It is understood that the contracts for the balance of the stone work the wood and the site root will ha this week and that the work is to be pushed forward as rapidly as good weather lasts The steel work or the roof is all in place tiow and the natural desire is to have the roof on and the building en enclosed closed before bad weather sets in |