Show SALT LAKE LIE ROUTE IS RUSHING REPAIR WORK Two Gangs of Men Bending All Their Th Efforts to Replacing the Track According to reliable advises advices from points along the tho Meadow Valley wash Valli on the Salt Lake Route the railroad company has reconstruction work In full tull awing both ways out of ot A large force torce is working north from Moapa and south from Barclay Those who have recently visited the scene oC ot the washouts washout assert aHert that there ther Is reason to believe that the main line will be In to shape for tor the opera operation operatIon operation tion of trains between Salt Bait Lake and Los Angeles not later than May 15 16 The fact tact that the track is rapidly being repaired In Clover Calley Galley indicates that the company expects to use Clover Valley canyon temporarily Engineers of ot the company have stated however that it has been definitely decided to build a new newline newline line Une over Sheep Springs pass thence on onto onto onto to the south passing only a few miles from the town of ot Panaca and Intercept InterceptIng Ing the Pioche branch between Panaca and Yoakum ranch It is rumored that the company will establish a division point in the vicinity of ot where the new line would strike the Panaca branch Tho The Utah Construction company has a large outfit working in Clover Valley canyon Fifteen carloads of ot horses and equipment arrived at Acoma last Sunday where they were unloaded and dispatched to the scene of reconstruction action |