Show SALT lAKE ROUTE Will OPEN SOON Within Forty Days Trains rains May MayBe MayBe MayBe Be Running Through to Los Angeles Through traffic between Salt Lake and Los Angeles over the San Pedro Los Angeles Salt Lake railroad will willbe willbe be resumed within forty days accord accordIng accordIng according Ing to official announcement made from the local offices of ot the Salt Lake Route yesterday The repair work is I progressing with much better bettor headway than had been hoped for and It now begins to look as though train service over the entire route which has been abandoned since the disastrous wash washouts washouts outs of last December and early Janu January January January ary in Meadow Valley wash will be started some time in June Repair work on tho the damaged por portions portions portions of track between Acoma and Rex RexIs Rexis Is being pushed with all possible speed two trains daily dally working from Call Cali Caliente ente west two trains dally daily from Mo ilo Moapa Moapa apa east and two dally daily and one night trains from Acoma west Men Mon are be being beIng being ing sent to the front dally daily from Salt Lake and Los Angeles and everything possible to bring about a speedy roe res restoration of traffic is being done miles mUes of ot road have been rebuilt of the washed out portion and there still remain 64 6 miles to be con constructed constructed constructed most difficult portion of ot the task was the 15 1 miles between Guelph and Bat and this has Just been completed The work remaining to be bedone bedone bedone done is said to be of a much less dif difficult diffIcult difficult nature and the fact that a great greatly gr t ly increased gang is at work insures a speedy completion |