Show PREPARES PlANS fOR FORNE NEW NE PEERY BUilDING Architect Irving Goodfellow Finish Finishing Finishing Finishing ing Specifications for 5 Structure Plans for tor the new Peery building to tobe tobe tobe be erected at the corner cornel of West Vest Tem Tern Temple Tempie pie and Third South streets Just south of ot the th Dooly block are now being beng pre prepared prepared prepared pared and show a building with stores on the ground floor and a hotel above The new building bunding will have bave a of IBS feet on West Third South and feet teet on West Tem Tern Temple Temple pie street The completed building will cost about Final plans plaus which are being bein prepared by Architect Irving Goodfellow are not yet complete and full fun details of ot the structure are still lacking Mr Good Goodfellow Goodfellow Goodfellow fellow said yesterday that It had not been decided whether the foundation would be made strong enough to carry additional stories at some future time but it is thought this will wilt be the case It has been b en decided however to pro proceed proceed proceed with the erection of ot the new build buildIng building building Ing Independently of any of the adjoin adjoining adjoining adjoinIng ing property owners and erect a hotel that shall be the equal to any structure of the size in the city The hotel lobby obby will be on the ground gro nd floor and all appointments will be of the very ver latest All modern Improve Improvements improvements ments will be installed such as steam heat electric lights hot and cold water In all the rooms and many features seen only In the most modern and aud up structures of the class lass Ground for tor the new structure will be broken just as soon as final plans are com corn completed completed and the building will be com corn completed completed by early fall fail |