Show W WILL SINK Management Decides to Put Down 1 Permanent Op rating Shaft C underground having been In u a manner that fully the management in taking the step th the mine at Tintic is now I t to b opened through a working shaft from th the surface This decision was arrived at Saturday night when the directors got together and discussed I t reports that had been previously tiled med by the engineers and To got get the work started and provIde the mens to crry carry it on onan onan an assessment of Ie Ic a share was lev upon the capital stock of the cor i the great bulk of whIch Is hv by three or four men menThe The n new w shaft wm will be put down to toa toa a depth of 30 or feet on the start and the fissures that have been tr rt up and prospected through th lorg lorg and badly twisted tunnel wl wIll thEn then be tapped at consIderable depth below the present workings or from 60 to feet beneath the apex of the lodes The work already done and J whIch has resulted In a gret great del deal of ore orp having been mined has dam dem that the bottom Is now in inn Ina n a belt of quartz that is by other rich bodies of ore oreo o go deeper and mine them through the tunnel workings would be a most t and expensive task and to avoid i it the shaft wil will be put down at a convenient point This work was seriously considered I morE more than a year jear ago hut but it was fn fin finalLy al alLy decided to go on wIth mft merit U util ti such time as I it wa was con cone e lus ely proven that the work was jUstifiable ThIs time has hns no now arrived and not a momet moment will be lost in open opening ing ng th the mine for permanent and |