Show TAKE OUT ALTA AL TA ORE Special to tp The Sandy Sand March 22 The work of trans transporting transporting transporting porting ore from Alta is going on stead steadily steadily ily 11 More than teams are engaged eng ged ia tj the work of hauling the ore from the mines to the sampler here Al Although Although Although though there Is still much snow in the ravine the teams are able to go as far as the tra station st where the loading Is done Lie TSie output from Alta this winter has been good The Pioneer sampler at this place Is la now running to its capacity releasing from five to dx cars per pet day |