Show WORK IS HUMMING I AT BOSTON CON MILL Engineer A J Bettles Settles reports splendid headway now being made in the con construction construction of oC the Boston Consolidated great milling plant at Gar Garfield Garfield field The crude ore receiving bin build buildings ings lags and all the thc trestles for the railroad track leading to them are now completed ed eti So is the main crushing department of the mill proper This portion of the mammoth structure contains more steel and is more imposing in appearance thin than any other portion of the works as It is the highest The steel frame work in the west end of the main concentrating building covering the tho first two sections is also in place and Mr Bettles states that steel is i rolling roiling in at a pace that is gratifying to see while a large force of mechanics are knitting it together At the rate things are now moving the Boston Consolidated company will wilt be bt ready to begin the treatment of tons tOIS of ore a day before the dog days daS of summer |