| Show MONTGOMERY SHOSHONE IS SHIPPING HEAVILY HEA VILI Rhyolite New Nev Ne April 8 The spur track trac to the Montgomery Shoshone wine trine has hR been completed ted and the shipment of the th dump to the Salt Lake take smelters smeller has begun One carload of ot high grade grod ore will be shipped out each day da until I l the completion of ol the mill The ore is b bb being b ing sacked and loaded from the dump straight into the cars and as soon as a athe the mill Is complete a big force of men will he set to work sloping from the sari vari various sarious art artous ous levels The Polaris has been connected conn td with the main workings of ot the Shoshone and the hoisting all is done through the Sho Shoo Shoshones Shoshones new triple compartment shaft White While this section of the big mine is lit little littie littie tie tle talked about It Is giving promise to become a producer as great as the original origInal origInal inal Schwab purchase Drifts cross crosscuts crosscuts crosscuts cuts and stations have been blen arranged I throughout both mines and the work of or getting the ore blocked out and on to the dumps can begin at any any am time The one thing that is holding the mine back is the fact that the machinery ma for forthe forthe forthe the big mill Is on the wrong side of the bit big washout and an 1 cannot be brought in m until the Caliente washout is repaired The building is practically complete and only onh the installation of the machinery machiner will willoe willbe willbe be oe required to make the mine a dividend i laer of the first water The mine has now feet of shaft feet teet of ot tunnels drifts crosscuts cro cuts chambers and stations and has a fifty horsepower hoist in operation with about I men at work |